Conduct annual helicopter fly-over to locate and map floating and
submerged hazards. Regular removal of floating and anchored hazards.
Provide highly visible marker buoys for identifying hazards that cannot
be removed.
Develop complete underwater charts for the lake, showing hazards that
will emerge at various lake levels.
Provide supplies of the "variable-water-level" charts at primary
locations throughout the project boundary.
Install and maintain strobe lights at islands and tip of the Peninsula
and other hazardous locations.
Maintain all Licensee Forest lands within one mile of the shoreline to
USFS/CDF fuel break standards.
Provide increased fires protection capacity (additional emergency water
tank, well and hydrants) at the hill above Prattville hydro facilities to
protect Licensee buildings and property and adjacent structures and
property. |