Draft Meeting Agenda
Assessment of High Instream Flow Releases Through the Canyon Dam Low-Level Outlet developed by Bechtel
Temperature Exceedence Results at Belden Dam developed by PG&E
Preliminary Model Simulation for NFFR with 325 cfs Seneca Instream Flow developed by PG&E
Aerial Photos of Cooling Tower Footprints
Revised Evaluation of Additional Alternatives to Provide Cooler Water to NFFR
Seneca Reach - Normalized Temperature-Condition RSI (WUA) Under Normal Conditions
Yellow Creek Diversion Cooling Water Pipeline Feasibility Study prepared by Black and Veatch