March 28, 2005 2105 Licensing Group Meeting Materials

 

Draft Meeting Agenda

Assessment of High Instream Flow Releases Through the Canyon Dam Low-Level Outlet developed by Bechtel 

Temperature Exceedence Results at Belden Dam developed by PG&E

Preliminary Model Simulation for NFFR with 325 cfs Seneca Instream Flow developed by PG&E

Aerial Photos of Cooling Tower Footprints 

Revised Evaluation of Additional Alternatives to Provide Cooler Water to NFFR

Seneca Reach - Normalized Temperature-Condition RSI (WUA) Under Normal Conditions

Yellow Creek Diversion Cooling Water Pipeline Feasibility Study prepared by Black and Veatch